Downtown Thrift Shop Remodeling and Construction
Summer and Fall of 2008

Waiting for the sign
The sign is up

After digging out about 4 - 6 inches of sand in the basement
cement was brought in to make a nice floor

Now even Al can stand up in the basement!

The former "green" room and dressing room of the annex
is cleaned and carpet taken out to make room for the Thrift Shop

 

The ceiling is prepared for painting and the room is cleaned out

 

Old plaster is taken off the wall

 

Getting ready to open the arches between the rooms

 

Ryan H. and Dale W. show the size of the sign

A view from the front door, looking in

 

The arches are cut and drywall applied

 

Carl is painting the ceiling

Now to clean up and get the floor ready to paint

 

The floor is painted and about ready to move in Carl and Al discuss where to put everything

 

 